A comprehensive renewable energy application project based on 100mw CAES
Being connected to the grid and put in action in December 2021, the project is the worldwide first 100-megawatt level advanced CAES power station, as well as the world's largest physical energy storage system without using natural salt caverns, consists of 100MW x 4h CAES, 800MW renewable energy and 50MW natural gas cogeneration.
-
Green power supply to Zhangbei Alibaba IDC Microgrid Demonstration Project
Being connected to the grid and put in action in December 2021, the project is the worldwide first 100-megawatt level advanced CAES power station, as well as the world's largest physical energy storage system without using natural salt caverns, consists of 100MW x 4h CAES, 800MW renewable energy and 50MW natural gas cogeneration.
-
Zhangbei 1GW Wind Power Project
The project includes1,000MW wind power and 150MW/300MWh energy storage system, with a total investment of about 8.5 billion yuan whih is completed and put in action in December 2023
-
Alxa League Hydraulic Pneumatic Composite Energy Storage System Demonstration Project
The project is expected to realize 100% green electriciy consumption located in Alxa League, Inner Mongolia . The total installed capacity is 310MW(60MW energy storage power station, 200MW wind power and 50MW photovoltaic power), which is supposed to be completed in December 2025.
-
Jiugongshan Pumped Storage Project in Yu County
TWith worldwide highest rated head 727m, the project is expected to complete contruction in year of 2029. The installed capacity is 1.6 million kilowatts, and the total investment is 11.107 billion yuan.